Yes, if there's equality at all it must logically come from that, under straightedge and compass rules." Equality must result from the precision of the construction, and not be a factor in the construction process. " Sure about that??
Each construction must be exact. "Eyeballing" it (essentially looking at the construction and guessing at its accuracy, or using some form of measurement, such as the units of measure on a ruler) and getting close does not count as a solution.
Each construction must terminate. That is, it must have a finite number of steps, and not be the limit of ever closer approximations.
I guess precision from construction can start on a table as an engineer draws it for the builder to perform. Thus, equality can result from the construction process. Theodolites, builders levels, and such, are the builder's rules and compasses, GPS coordinates, and electronic distance measurers. They use different tools to actually make and reproduce what is on paper in much larger scales. Nice square, btw.